Our team has participated in the construction, operation and maintenance of the following projects:

1. King Abdul Aziz International Airport fuel farm, Jeddah, KSA.Fuel farm construction, eight fuel tanks capacity 10000 m3 each one, ten medium voltage pumps 250 kW each one, MV motor control center for MV pumps...
2. KfarKatra WWTP, Chouf Lebanon.
3. M’sila WWTP (300,000 capita), Wilaya M’sila,Algeria. Lift station, A2O process, mechanical dewatering( belt press) and sludge drying beds, Chlorine disinfection system. Stand by generating system 1000 KVA.
4. Joub JannineWWTP (100,000 capita). Lift station, A2O process, mechanical dewatering ( belt press), Gravity disk filters and UV disinfection. Active Carbon odor control unit and stand by generating station.
5. Saghbine WWTP and 9 Pumping Stations West Bekaa. Nine external lift station and one at the WWTP, A2O process, mechanical dewatering ( belt press), Gravity disk filters and UV disinfection. Active Carbon odor control unit and stand by generating station.
6. Ras Tannoura WWTP, Dammam KSA.
7. Extension of Tripoli water treatment Station (30,000 m3/day), Lebanon. Lift station, lamella decanters, rapid sand filters, Chlorine disinfection system.
8. Tipaza WWTP (70,000 capita), WilayaTipaza, Algeria. Lift station, A2O process, mechanical dewatering( belt press) and Chlorine disinfection system.
9. TigzirtWWTP, Wilaya Tizi Ouzou, Algeria.
10. Hadjout WWTP (70,000 capita)Wilaya Tipaza, Algeria. Lift station, Extended aeration process, mechanical dewatering and sludge drying beds, Chlorine disinfection system.
11. Nabatyeh WWTP (80,000 capita). Lebanon. Lift station, A2O process, mechanical dewatering (Centrifugal system), Chlorine disinfection. Chemical odor control unit and stand by generating station.
12. Yammouneh village infrastructure, pumping stations, WWTP and water well.
13. BaalbeckWWTP (100,000 capita). Lebanon.
14. Banana Island and EKO suites sewage treatment plant, Lagos, Nigeria.
15. Ghadir Out fall Pretreatment Plant, Beirut. Lebanon.
16. NERP1, First year Emerging Recovering Program water supply project and water treatment plants(4 treatment plants, serving more than 500,000capita, 89 Chlorine stations). Lebanon
17. Saida Coastal Area WWTP. Lebanon.
18. University tower Reverse Osmosis. Lebanon.
19. Bella Riva hotel Reverse Osmosis. Lebanon.
20. Villa Zantout Reverse Osmosis and disinfection station. Lebanon.