Our team has participated in the construction,
operation and maintenance of the following projects:
| 1. King Abdul Aziz International Airport fuel farm,
Jeddah, KSA.Fuel farm construction, eight fuel tanks capacity
10000 m3 each one, ten medium voltage pumps 250 kW each one,
MV motor control center for MV pumps... |
| 2. KfarKatra WWTP, Chouf Lebanon. |
| 3. M’sila WWTP (300,000 capita), Wilaya
M’sila,Algeria. Lift station, A2O process, mechanical
dewatering( belt press) and sludge drying beds, Chlorine
disinfection system. Stand by generating system 1000
KVA. |
| 4. Joub JannineWWTP (100,000 capita). Lift station,
A2O process, mechanical dewatering ( belt press), Gravity disk
filters and UV disinfection. Active Carbon odor control unit
and stand by generating station. |
| 5. Saghbine WWTP and 9 Pumping Stations West Bekaa.
Nine external lift station and one at the WWTP, A2O process,
mechanical dewatering ( belt press), Gravity disk filters and
UV disinfection. Active Carbon odor control unit and stand by
generating station. |
| 6. Ras Tannoura WWTP, Dammam KSA. |
| 7. Extension of Tripoli water treatment Station
(30,000 m3/day), Lebanon. Lift station, lamella decanters,
rapid sand filters, Chlorine disinfection system. |
| 8. Tipaza WWTP (70,000 capita), WilayaTipaza,
Algeria. Lift station, A2O process, mechanical dewatering(
belt press) and Chlorine disinfection system. |
| 9. TigzirtWWTP, Wilaya Tizi Ouzou, Algeria. |
| 10. Hadjout WWTP (70,000 capita)Wilaya Tipaza, Algeria.
Lift station, Extended aeration process, mechanical dewatering
and sludge drying beds, Chlorine disinfection system. |
| 11. Nabatyeh WWTP (80,000 capita). Lebanon. Lift
station, A2O process, mechanical dewatering (Centrifugal
system), Chlorine disinfection. Chemical odor control unit and
stand by generating station. |
| 12. Yammouneh village infrastructure, pumping stations,
WWTP and water well. |
| 13. BaalbeckWWTP (100,000 capita). Lebanon. |
| 14. Banana Island and EKO suites sewage treatment plant,
Lagos, Nigeria. |
| 15. Ghadir Out fall Pretreatment Plant, Beirut.
Lebanon. |
| 16. NERP1, First year Emerging Recovering Program water
supply project and water treatment plants(4 treatment plants,
serving more than 500,000capita, 89 Chlorine stations).
Lebanon |
| 17. Saida Coastal Area WWTP. Lebanon. |
| 18. University tower Reverse Osmosis. Lebanon. |
| 19. Bella Riva hotel Reverse Osmosis. Lebanon. |
| 20. Villa Zantout Reverse Osmosis and disinfection
station. Lebanon. | |
|
|